ASGI-2013-003 (ASGI-2013-003)

ASGI-2013-003 is a 18.4 MW wind interconnection project in Quay County, New Mexico with a current status of operational.

18.4 MWCapacity
OperationalStatus
NMMarket
WindTechnology

Project facts

Canonical nameASGI-2013-003
Queue IDASGI-2013-003
Statusoperational
Source status
MarketNM
TechnologyWind
Capacity18.4 MW
StateNew Mexico
CountyQuay County
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2014-12-31
Withdrawn date
Developer
Utility / transmission ownerSPP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata