ASGI-2020-002 (ASGI-2020-002)
ASGI-2020-002 is a 45.0 MW solar interconnection project with a current status of withdrawn.
45.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology
Project facts
| Canonical name | ASGI-2020-002 |
|---|---|
| Queue ID | ASGI-2020-002 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | — |
| Technology | Solar |
| Capacity | 45.0 MW |
| State | — |
| County | — |
| Point of interconnection | — |
| Requested (queue) date | 2020-04-30 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2023-03-21 |
| Developer | — |
| Utility / transmission owner | SPP |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata