ASGI-2020-002 (ASGI-2020-002)

ASGI-2020-002 is a 45.0 MW solar interconnection project with a current status of withdrawn.

45.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameASGI-2020-002
Queue IDASGI-2020-002
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity45.0 MW
State
County
Point of interconnection
Requested (queue) date2020-04-30
Proposed in-service date
Operational date
Withdrawn date2023-03-21
Developer
Utility / transmission ownerSPP

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata