ASGI-2021-002 (ASGI-2021-002)

ASGI-2021-002 is a 55.0 MW solar interconnection project with a current status of withdrawn.

55.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameASGI-2021-002
Queue IDASGI-2021-002
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity55.0 MW
State
County
Point of interconnection
Requested (queue) date2021-04-26
Proposed in-service date
Operational date
Withdrawn date2023-07-17
Developer
Utility / transmission ownerSPP

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.