Assembly Solar Project (62422_ASP01)

Assembly Solar Project is a 50.0 MW solar interconnection project in Shiawassee, Michigan with a current status of operational.

50.0 MWCapacity
OperationalStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameAssembly Solar Project
Queue ID62422_ASP01
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologySolar
Capacity50.0 MW
StateMichigan
CountyShiawassee
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2020-12-01
Withdrawn date
Developer
Utility / transmission ownerAssembly Solar III, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata