ATC Ebenezer Sub on Lancaster-Eden 138kv line (J1374)

ATC Ebenezer Sub on Lancaster-Eden 138kv line is a 95.0 MW wind interconnection project in Grant County, Wisconsin with a current status of operational. It is proposed to connect at ATC Ebenezer Sub on Lancaster-Eden 138kv line.

95.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameATC Ebenezer Sub on Lancaster-Eden 138kv line
Queue IDJ1374
Statusoperational
Source statusDone
Market
TechnologyWind
Capacity95.0 MW
StateWisconsin
CountyGrant County
Point of interconnectionATC Ebenezer Sub on Lancaster-Eden 138kv line
Requested (queue) date2019-04-29
Proposed in-service date2021-08-01
Operational date2021-08-01
Withdrawn date
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.