ATC WInona-Atlantic Minw 69 kV tap (J1244) (J1817)

ATC WInona-Atlantic Minw 69 kV tap (J1244) is a 20.0 MW wind interconnection project in Houghton, Michigan with a current status of withdrawn. It is proposed to connect at ATC WInona-Atlantic Minw 69 kV tap (J1244).

20.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameATC WInona-Atlantic Minw 69 kV tap (J1244)
Queue IDJ1817
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity20.0 MW
StateMichigan
CountyHoughton
Point of interconnectionATC WInona-Atlantic Minw 69 kV tap (J1244)
Requested (queue) date2020-07-28
Proposed in-service date2021-09-15
Operational date2021-09-15
Withdrawn date2023-02-28
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata