Athens Energy Storage (1405)

Athens Energy Storage is a 300.0 MW battery interconnection project in Greene, New York with a current status of withdrawn. It is proposed to connect at Leeds 3-Van Wagner 345 kV Line.

300.0 MWCapacity
WithdrawnStatus
FMarket
BatteryTechnology

Project facts

Canonical nameAthens Energy Storage
Queue ID1405
Statuswithdrawn
Source status0
MarketF
TechnologyBattery
Capacity300.0 MW
StateNew York
CountyGreene
Point of interconnectionLeeds 3-Van Wagner 345 kV Line
Requested (queue) date2022-07-16
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperAthens Energy Stoarge LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.