Atlanta – Tuscola 120 kV line(265183) (S1007)

Atlanta – Tuscola 120 kV line(265183) is a 70.0 MW generation interconnection project in Tuscola, Michigan with a current status of withdrawn. It is proposed to connect at Atlanta – Tuscola 120 kV line(265183).

70.0 MWCapacity
WithdrawnStatus
Market
GenerationTechnology

Project facts

Canonical nameAtlanta – Tuscola 120 kV line(265183)
Queue IDS1007
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGeneration
Capacity70.0 MW
StateMichigan
CountyTuscola
Point of interconnectionAtlanta – Tuscola 120 kV line(265183)
Requested (queue) date2021-07-08
Proposed in-service date2022-10-01
Operational date2022-10-01
Withdrawn date2024-08-15
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata