Atlantic -Silver River 138 kV (J1809)

Atlantic -Silver River 138 kV is a 62.5 MW solar interconnection project in Houghton, Michigan with a current status of withdrawn. It is proposed to connect at Atlantic -Silver River 138 kV.

62.5 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameAtlantic -Silver River 138 kV
Queue IDJ1809
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity62.5 MW
StateMichigan
CountyHoughton
Point of interconnectionAtlantic -Silver River 138 kV
Requested (queue) date2020-06-24
Proposed in-service date2023-08-15
Operational date2023-08-15
Withdrawn date2021-02-19
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata