ATP TES Data Server (L0668)
ATP TES Data Server is a 250.0 MW other interconnection project with a current status of active. It is proposed to connect at Benton Substation 115 kV.
250.0 MWCapacity
ActiveStatus
—Market
OtherTechnology
Project facts
| Canonical name | ATP TES Data Server |
|---|---|
| Queue ID | L0668 |
| Status | active |
| Source status | RECEIVED |
| Market | — |
| Technology | Other |
| Capacity | 250.0 MW |
| State | — |
| County | Benton |
| Point of interconnection | Benton Substation 115 kV |
| Requested (queue) date | 2025-10-07 |
| Proposed in-service date | 2027-07-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | City of Richland, Washington |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.