AUBANEL I WIND PROJECT (643B)
AUBANEL I WIND PROJECT is a 300.0 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at Imperial Valley Sub 230 kV Bus.
300.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology
Project facts
| Canonical name | AUBANEL I WIND PROJECT |
|---|---|
| Queue ID | 643B |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | — |
| Technology | Wind |
| Capacity | 300.0 MW |
| State | MX |
| County | Baja California |
| Point of interconnection | Imperial Valley Sub 230 kV Bus |
| Requested (queue) date | 2010-07-31 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2010-11-26 |
| Developer | — |
| Utility / transmission owner | SDGE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata