AUBANEL I WIND PROJECT (643B)

AUBANEL I WIND PROJECT is a 300.0 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at Imperial Valley Sub 230 kV Bus.

300.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameAUBANEL I WIND PROJECT
Queue ID643B
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyWind
Capacity300.0 MW
StateMX
CountyBaja California
Point of interconnectionImperial Valley Sub 230 kV Bus
Requested (queue) date2010-07-31
Proposed in-service date
Operational date
Withdrawn date2010-11-26
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata