AUBANEL WIND PROJECT (303)

AUBANEL WIND PROJECT is a 500.0 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at Imperial Valley - Miguel 500kV line.

500.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameAUBANEL WIND PROJECT
Queue ID303
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyWind
Capacity500.0 MW
StateMX
CountyBaja California
Point of interconnectionImperial Valley - Miguel 500kV line
Requested (queue) date2008-02-27
Proposed in-service date
Operational date
Withdrawn date2008-10-27
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata