Augusta E/Puddledock/Bowman St 115 kV SS - Midcoast Area DG Study (1465)

Augusta E/Puddledock/Bowman St 115 kV SS - Midcoast Area DG Study is a 18.6 MW solar+battery interconnection project in Kennebec, Maine with a current status of withdrawn. It is proposed to connect at CMP Augusta E/Puddledock/Bowman St 115 kV substation.

18.6 MWCapacity
WithdrawnStatus
MEMarket
Solar+BatteryTechnology

Project facts

Canonical nameAugusta E/Puddledock/Bowman St 115 kV SS - Midcoast Area DG Study
Queue ID1465
Statuswithdrawn
Source statusW
MarketME
TechnologySolar+Battery
Capacity18.6 MW
StateMaine
CountyKennebec
Point of interconnectionCMP Augusta E/Puddledock/Bowman St 115 kV substation
Requested (queue) date2023-12-05
Proposed in-service date2024-12-31
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata