Augusta E. Side 115 kV SS - Augusta Area Study (1070)

Augusta E. Side 115 kV SS - Augusta Area Study is a 4.2 MW solar+battery interconnection project in Kennebec, Maine with a current status of operational. It is proposed to connect at CMP SOUTH CHINA Substation, Circuit 244D2.

4.2 MWCapacity
OperationalStatus
MEMarket
Solar+BatteryTechnology

Project facts

Canonical nameAugusta E. Side 115 kV SS - Augusta Area Study
Queue ID1070
Statusoperational
Source statusC
MarketME
TechnologySolar+Battery
Capacity4.2 MW
StateMaine
CountyKennebec
Point of interconnectionCMP SOUTH CHINA Substation, Circuit 244D2
Requested (queue) date2020-10-02
Proposed in-service date
Operational date2022-12-13
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata