Auxiliary Load (L0675)
Auxiliary Load is a 50.0 MW other interconnection project with a current status of active. It is proposed to connect at BPA's planned Manhattan Substation.
50.0 MWCapacity
ActiveStatus
—Market
OtherTechnology
Project facts
| Canonical name | Auxiliary Load |
|---|---|
| Queue ID | L0675 |
| Status | active |
| Source status | STUDY |
| Market | — |
| Technology | Other |
| Capacity | 50.0 MW |
| State | — |
| County | — |
| Point of interconnection | BPA's planned Manhattan Substation |
| Requested (queue) date | 2025-12-03 |
| Proposed in-service date | 2032-04-05 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Energy Efficiency Solar, Inc. dba ACRO Energy Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata