AVS 345kV substation (GEN-2021-095)

AVS 345kV substation is a 446.5 MW gas interconnection project in Mercer, North Dakota with a current status of withdrawn. It is proposed to connect at AVS 345kV substation.

446.5 MWCapacity
WithdrawnStatus
NDMarket
GasTechnology

Project facts

Canonical nameAVS 345kV substation
Queue IDGEN-2021-095
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologyGas
Capacity446.5 MW
StateNorth Dakota
CountyMercer
Point of interconnectionAVS 345kV substation
Requested (queue) date2021-04-30
Proposed in-service date2028-04-01
Operational date
Withdrawn date2022-11-21
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata