AW300S (LG-23-3-2)
AW300S is a 300.0 MW solar interconnection project in Truth Or Consequences, New Mexico with a current status of active. It is proposed to connect at Westmesa-Arroyo 345kV.
300.0 MWCapacity
ActiveStatus
NMMarket
SolarTechnology
Project facts
| Canonical name | AW300S |
|---|---|
| Queue ID | LG-23-3-2 |
| Status | active |
| Source status | LGIA EXECUTED |
| Market | NM |
| Technology | Solar |
| Capacity | 300.0 MW |
| State | New Mexico |
| County | Truth Or Consequences |
| Point of interconnection | Westmesa-Arroyo 345kV |
| Requested (queue) date | 2023-03-31 |
| Proposed in-service date | 2029-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | El Paso Electric Company |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: epe-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata