AW300S (LG-23-3-2)

AW300S is a 300.0 MW solar interconnection project in Truth Or Consequences, New Mexico with a current status of active. It is proposed to connect at Westmesa-Arroyo 345kV.

300.0 MWCapacity
ActiveStatus
NMMarket
SolarTechnology

Project facts

Canonical nameAW300S
Queue IDLG-23-3-2
Statusactive
Source statusLGIA EXECUTED
MarketNM
TechnologySolar
Capacity300.0 MW
StateNew Mexico
CountyTruth Or Consequences
Point of interconnectionWestmesa-Arroyo 345kV
Requested (queue) date2023-03-31
Proposed in-service date2029-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: epe-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata