AZ Queue Project 103 — Wind in Apache County, Arizona

AZ Queue Project 103 — Wind in Apache County, Arizona is a 768.0 MW wind interconnection project in Apache County, Arizona with a current status of active. It is proposed to connect at Springerville 345kV Substation.

768.0 MWCapacity
ActiveStatus
AZMarket
WindTechnology

Project facts

Canonical nameAZ Queue Project 103 — Wind in Apache County, Arizona
Queue ID103
Statusactive
Source statusNTP with Design
MarketAZ
TechnologyWind
Capacity768.0 MW
StateArizona
CountyApache County
Point of interconnectionSpringerville 345kV Substation
Requested (queue) date2021-11-09
Proposed in-service date2030-05-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTucson Electric Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: tep-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata