AZ Queue Project 119 — Solar+Battery in Greenlee County, Arizona

AZ Queue Project 119 — Solar+Battery in Greenlee County, Arizona is a 270.0 MW solar+battery interconnection project in Greenlee County, Arizona with a current status of active. It is proposed to connect at Greenlee-Winchester 345kV Transmission Line.

270.0 MWCapacity
ActiveStatus
AZMarket
Solar+BatteryTechnology

Project facts

Canonical nameAZ Queue Project 119 — Solar+Battery in Greenlee County, Arizona
Queue ID119
Statusactive
Source statusLGIA executed
MarketAZ
TechnologySolar+Battery
Capacity270.0 MW
StateArizona
CountyGreenlee County
Point of interconnectionGreenlee-Winchester 345kV Transmission Line
Requested (queue) date2022-04-21
Proposed in-service date2031-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerTucson Electric Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: tep-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata