AZ Queue Project 121 — Battery in Pinal County, Arizona

AZ Queue Project 121 — Battery in Pinal County, Arizona is a 200.0 MW battery interconnection project in Pinal County, Arizona with a current status of active. It is proposed to connect at Pinal West 345kV Substation.

200.0 MWCapacity
ActiveStatus
AZMarket
BatteryTechnology

Project facts

Canonical nameAZ Queue Project 121 — Battery in Pinal County, Arizona
Queue ID121
Statusactive
Source statusLGIA executed
MarketAZ
TechnologyBattery
Capacity200.0 MW
StateArizona
CountyPinal County
Point of interconnectionPinal West 345kV Substation
Requested (queue) date2022-05-20
Proposed in-service date2029-12-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerTucson Electric Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: tep-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata