AZ Queue Project 2023-G5.1 — Solar+Battery in Coconino County, Arizona

AZ Queue Project 2023-G5.1 — Solar+Battery in Coconino County, Arizona is a 400.0 MW solar+battery interconnection project in Coconino County, Arizona with a current status of withdrawn. It is proposed to connect at Flagstaff - Pinnacle Peak 345-kV.

400.0 MWCapacity
WithdrawnStatus
AZMarket
Solar+BatteryTechnology

Project facts

Canonical nameAZ Queue Project 2023-G5.1 — Solar+Battery in Coconino County, Arizona
Queue ID2023-G5.1
Statuswithdrawn
Source statusWithdrawn
MarketAZ
TechnologySolar+Battery
Capacity400.0 MW
StateArizona
CountyCoconino County
Point of interconnectionFlagstaff - Pinnacle Peak 345-kV
Requested (queue) date2023-03-26
Proposed in-service date2027-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Rocky Mountain Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata