AZ Queue Project 2025-G3 — Wind in Coconino County, Arizona
AZ Queue Project 2025-G3 — Wind in Coconino County, Arizona is a 500.0 MW wind interconnection project in Coconino County, Arizona with a current status of active. It is proposed to connect at Flagstaff Substation 345kV.
500.0 MWCapacity
ActiveStatus
AZMarket
WindTechnology
Project facts
| Canonical name | AZ Queue Project 2025-G3 — Wind in Coconino County, Arizona |
|---|---|
| Queue ID | 2025-G3 |
| Status | active |
| Source status | In Progress |
| Market | AZ |
| Technology | Wind |
| Capacity | 500.0 MW |
| State | Arizona |
| County | Coconino County |
| Point of interconnection | Flagstaff Substation 345kV |
| Requested (queue) date | 2025-08-28 |
| Proposed in-service date | 2028-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Western Area Power Administration - Rocky Mountain Region |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.