AZ Queue Project 98 — Solar+Battery in Pinal County, Arizona

AZ Queue Project 98 — Solar+Battery in Pinal County, Arizona is a 241.0 MW solar+battery interconnection project in Pinal County, Arizona with a current status of active. It is proposed to connect at Pinal West - West Wing 345kV.

241.0 MWCapacity
ActiveStatus
AZMarket
Solar+BatteryTechnology

Project facts

Canonical nameAZ Queue Project 98 — Solar+Battery in Pinal County, Arizona
Queue ID98
Statusactive
Source statusNTP with Design
MarketAZ
TechnologySolar+Battery
Capacity241.0 MW
StateArizona
CountyPinal County
Point of interconnectionPinal West - West Wing 345kV
Requested (queue) date2021-09-28
Proposed in-service date2030-03-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerTucson Electric Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: tep-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata