AZ Queue Project ANPP HVS Q33 — Battery in Maricopa, Arizona

AZ Queue Project ANPP HVS Q33 — Battery in Maricopa, Arizona is a 300.0 MW battery interconnection project in Maricopa, Arizona with a current status of withdrawn. It is proposed to connect at Hassayampa 500 kV.

300.0 MWCapacity
WithdrawnStatus
AZMarket
BatteryTechnology

Project facts

Canonical nameAZ Queue Project ANPP HVS Q33 — Battery in Maricopa, Arizona
Queue IDANPP HVS Q33
Statuswithdrawn
Source statusWithdrawn
MarketAZ
TechnologyBattery
Capacity300.0 MW
StateArizona
CountyMaricopa
Point of interconnectionHassayampa 500 kV
Requested (queue) date2022-10-27
Proposed in-service date2025-09-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerSalt River Project

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.