AZ Queue Project ANPP VTS Q04 — Solar in Maricopa, Arizona

AZ Queue Project ANPP VTS Q04 — Solar in Maricopa, Arizona is a 440.0 MW solar interconnection project in Maricopa, Arizona with a current status of withdrawn. It is proposed to connect at Jojoba 500 kV.

440.0 MWCapacity
WithdrawnStatus
AZMarket
SolarTechnology

Project facts

Canonical nameAZ Queue Project ANPP VTS Q04 — Solar in Maricopa, Arizona
Queue IDANPP VTS Q04
Statuswithdrawn
Source statusWithdrawn
MarketAZ
TechnologySolar
Capacity440.0 MW
StateArizona
CountyMaricopa
Point of interconnectionJojoba 500 kV
Requested (queue) date2009-04-28
Proposed in-service date2013-01-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSalt River Project

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.