AZ Queue Project ANPP VTS Q15 — Solar in Maricopa, Arizona

AZ Queue Project ANPP VTS Q15 — Solar in Maricopa, Arizona is a 400.0 MW solar interconnection project in Maricopa, Arizona with a current status of withdrawn. It is proposed to connect at Jojoba 500 kV.

400.0 MWCapacity
WithdrawnStatus
AZMarket
SolarTechnology

Project facts

Canonical nameAZ Queue Project ANPP VTS Q15 — Solar in Maricopa, Arizona
Queue IDANPP VTS Q15
Statuswithdrawn
Source statusWithdrawn
MarketAZ
TechnologySolar
Capacity400.0 MW
StateArizona
CountyMaricopa
Point of interconnectionJojoba 500 kV
Requested (queue) date2023-07-10
Proposed in-service date2027-06-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSalt River Project

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata