AZ Queue Project Cluster 24 Q2401 — Battery in Maricopa, Arizona
AZ Queue Project Cluster 24 Q2401 — Battery in Maricopa, Arizona is a 204.0 MW battery interconnection project in Maricopa, Arizona with a current status of withdrawn. It is proposed to connect at Hassayampa 500 kV.
204.0 MWCapacity
WithdrawnStatus
AZMarket
BatteryTechnology
Project facts
| Canonical name | AZ Queue Project Cluster 24 Q2401 — Battery in Maricopa, Arizona |
|---|---|
| Queue ID | Cluster 24 Q2401 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | AZ |
| Technology | Battery |
| Capacity | 204.0 MW |
| State | Arizona |
| County | Maricopa |
| Point of interconnection | Hassayampa 500 kV |
| Requested (queue) date | 2024-02-05 |
| Proposed in-service date | 2027-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Salt River Project |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.