AZ Queue Project Cluster 24 Q2407 — Battery in Pinal, Arizona

AZ Queue Project Cluster 24 Q2407 — Battery in Pinal, Arizona is a 101.9 MW battery interconnection project in Pinal, Arizona with a current status of withdrawn. It is proposed to connect at Pinal Central 230 kV.

101.9 MWCapacity
WithdrawnStatus
AZMarket
BatteryTechnology

Project facts

Canonical nameAZ Queue Project Cluster 24 Q2407 — Battery in Pinal, Arizona
Queue IDCluster 24 Q2407
Statuswithdrawn
Source statusWithdrawn
MarketAZ
TechnologyBattery
Capacity101.9 MW
StateArizona
CountyPinal
Point of interconnectionPinal Central 230 kV
Requested (queue) date2024-02-05
Proposed in-service date2025-07-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerSalt River Project

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata