AZ Queue Project Cluster 24 Q2408 — Solar in Navajo, Arizona

AZ Queue Project Cluster 24 Q2408 — Solar in Navajo, Arizona is a 440.0 MW solar interconnection project in Navajo, Arizona with a current status of withdrawn. It is proposed to connect at Silver King-Coronado 500 kV Line.

440.0 MWCapacity
WithdrawnStatus
AZMarket
SolarTechnology

Project facts

Canonical nameAZ Queue Project Cluster 24 Q2408 — Solar in Navajo, Arizona
Queue IDCluster 24 Q2408
Statuswithdrawn
Source statusWithdrawn
MarketAZ
TechnologySolar
Capacity440.0 MW
StateArizona
CountyNavajo
Point of interconnectionSilver King-Coronado 500 kV Line
Requested (queue) date2024-02-05
Proposed in-service date2027-09-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerSalt River Project

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata