AZ Queue Project Cluster 25 Q2501 — Solar in Navajo, Arizona

AZ Queue Project Cluster 25 Q2501 — Solar in Navajo, Arizona is a 513.2 MW solar interconnection project in Navajo, Arizona with a current status of withdrawn. It is proposed to connect at Sugarloaf 500 kV.

513.2 MWCapacity
WithdrawnStatus
AZMarket
SolarTechnology

Project facts

Canonical nameAZ Queue Project Cluster 25 Q2501 — Solar in Navajo, Arizona
Queue IDCluster 25 Q2501
Statuswithdrawn
Source statusWithdrawn
MarketAZ
TechnologySolar
Capacity513.2 MW
StateArizona
CountyNavajo
Point of interconnectionSugarloaf 500 kV
Requested (queue) date2025-02-05
Proposed in-service date2029-03-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSalt River Project

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata