AZ Queue Project Cluster 25 Q2506 — Solar in Navajo, Arizona
AZ Queue Project Cluster 25 Q2506 — Solar in Navajo, Arizona is a 395.7 MW solar interconnection project in Navajo, Arizona with a current status of withdrawn. It is proposed to connect at Sugarloaf-Coronado 500 kV Line.
395.7 MWCapacity
WithdrawnStatus
AZMarket
SolarTechnology
Project facts
| Canonical name | AZ Queue Project Cluster 25 Q2506 — Solar in Navajo, Arizona |
|---|---|
| Queue ID | Cluster 25 Q2506 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | AZ |
| Technology | Solar |
| Capacity | 395.7 MW |
| State | Arizona |
| County | Navajo |
| Point of interconnection | Sugarloaf-Coronado 500 kV Line |
| Requested (queue) date | 2025-02-05 |
| Proposed in-service date | 2028-07-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Salt River Project |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata