AZ Queue Project PV-PC Q04 — Gas in Pinal, Arizona

AZ Queue Project PV-PC Q04 — Gas in Pinal, Arizona is a 659.0 MW gas interconnection project in Pinal, Arizona with a current status of withdrawn. It is proposed to connect at Pinal Central 500 kV.

659.0 MWCapacity
WithdrawnStatus
AZMarket
GasTechnology

Project facts

Canonical nameAZ Queue Project PV-PC Q04 — Gas in Pinal, Arizona
Queue IDPV-PC Q04
Statuswithdrawn
Source statusWithdrawn
MarketAZ
TechnologyGas
Capacity659.0 MW
StateArizona
CountyPinal
Point of interconnectionPinal Central 500 kV
Requested (queue) date2008-09-16
Proposed in-service date2012-06-15
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSalt River Project

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-10-05
Data last materially changed2026-10-05
Page data generated2026-10-11

Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata