AZ Queue Project PV-PC Q21 — Solar in Maricopa, Arizona

AZ Queue Project PV-PC Q21 — Solar in Maricopa, Arizona is a 433.0 MW solar interconnection project in Maricopa, Arizona with a current status of withdrawn. It is proposed to connect at Pinal West-Jojoba 500 kV Line.

433.0 MWCapacity
WithdrawnStatus
AZMarket
SolarTechnology

Project facts

Canonical nameAZ Queue Project PV-PC Q21 — Solar in Maricopa, Arizona
Queue IDPV-PC Q21
Statuswithdrawn
Source statusWithdrawn
MarketAZ
TechnologySolar
Capacity433.0 MW
StateArizona
CountyMaricopa
Point of interconnectionPinal West-Jojoba 500 kV Line
Requested (queue) date2021-10-01
Proposed in-service date2025-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerSalt River Project

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata