AZ Queue Project PV-PC Q24 — Battery in Pinal, Arizona
AZ Queue Project PV-PC Q24 — Battery in Pinal, Arizona is a 533.0 MW battery interconnection project in Pinal, Arizona with a current status of withdrawn. It is proposed to connect at Pinal Central 230 kV.
533.0 MWCapacity
WithdrawnStatus
AZMarket
BatteryTechnology
Project facts
| Canonical name | AZ Queue Project PV-PC Q24 — Battery in Pinal, Arizona |
|---|---|
| Queue ID | PV-PC Q24 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | AZ |
| Technology | Battery |
| Capacity | 533.0 MW |
| State | Arizona |
| County | Pinal |
| Point of interconnection | Pinal Central 230 kV |
| Requested (queue) date | 2022-09-27 |
| Proposed in-service date | 2025-09-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Salt River Project |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata