AZ Queue Project PV-PC Q29 — Battery in Pinal, Arizona

AZ Queue Project PV-PC Q29 — Battery in Pinal, Arizona is a 200.0 MW battery interconnection project in Pinal, Arizona with a current status of withdrawn. It is proposed to connect at Pinal West 500 kV.

200.0 MWCapacity
WithdrawnStatus
AZMarket
BatteryTechnology

Project facts

Canonical nameAZ Queue Project PV-PC Q29 — Battery in Pinal, Arizona
Queue IDPV-PC Q29
Statuswithdrawn
Source statusWithdrawn
MarketAZ
TechnologyBattery
Capacity200.0 MW
StateArizona
CountyPinal
Point of interconnectionPinal West 500 kV
Requested (queue) date2023-02-07
Proposed in-service date2026-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerSalt River Project

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata