AZ Queue Project PV-PC Q30 — Gas in Pinal, Arizona

AZ Queue Project PV-PC Q30 — Gas in Pinal, Arizona is a 297.0 MW gas interconnection project in Pinal, Arizona with a current status of withdrawn. It is proposed to connect at Pinal Central-Duke 500 kV Line.

297.0 MWCapacity
WithdrawnStatus
AZMarket
GasTechnology

Project facts

Canonical nameAZ Queue Project PV-PC Q30 — Gas in Pinal, Arizona
Queue IDPV-PC Q30
Statuswithdrawn
Source statusWithdrawn
MarketAZ
TechnologyGas
Capacity297.0 MW
StateArizona
CountyPinal
Point of interconnectionPinal Central-Duke 500 kV Line
Requested (queue) date2023-04-27
Proposed in-service date2026-01-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerSalt River Project

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata