AZ Queue Project Q387 — Solar+Battery in Navajo, Arizona is a 588.0 MW solar+battery interconnection project in Navajo, Arizona with a current status of active. It is proposed to connect at Cholla 500kV Requested POI Cedar Mountain-.

588.0 MWCapacity
ActiveStatus
AZMarket
Solar+BatteryTechnology

Project facts

Canonical nameAZ Queue Project Q387 — Solar+Battery in Navajo, Arizona
Queue IDQ387
Statusactive
Source statusPhase 4 Facilities Study Current Status Transitional Cluster:
MarketAZ
TechnologySolar+Battery
Capacity588.0 MW
StateArizona
CountyNavajo
Point of interconnectionCholla 500kV Requested POI Cedar Mountain-
Requested (queue) date2021-03-31
Proposed in-service date2025-01-12
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata