AZ Queue Project Q387 — Solar+Battery in Navajo, Arizona
AZ Queue Project Q387 — Solar+Battery in Navajo, Arizona is a 588.0 MW solar+battery interconnection project in Navajo, Arizona with a current status of active. It is proposed to connect at Cholla 500kV Requested POI Cedar Mountain-.
588.0 MWCapacity
ActiveStatus
AZMarket
Solar+BatteryTechnology
Project facts
| Canonical name | AZ Queue Project Q387 — Solar+Battery in Navajo, Arizona |
|---|---|
| Queue ID | Q387 |
| Status | active |
| Source status | Phase 4 Facilities Study Current Status Transitional Cluster: |
| Market | AZ |
| Technology | Solar+Battery |
| Capacity | 588.0 MW |
| State | Arizona |
| County | Navajo |
| Point of interconnection | Cholla 500kV Requested POI Cedar Mountain- |
| Requested (queue) date | 2021-03-31 |
| Proposed in-service date | 2025-01-12 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Arizona Public Service |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.