AZ Queue Project SRP Q104 — Solar+Battery in Pinal, Arizona
AZ Queue Project SRP Q104 — Solar+Battery in Pinal, Arizona is a 51.3 MW solar+battery interconnection project in Pinal, Arizona with a current status of active. It is proposed to connect at Abel 69 kV.
51.3 MWCapacity
ActiveStatus
AZMarket
Solar+BatteryTechnology
Project facts
| Canonical name | AZ Queue Project SRP Q104 — Solar+Battery in Pinal, Arizona |
|---|---|
| Queue ID | SRP Q104 |
| Status | active |
| Source status | In Progress |
| Market | AZ |
| Technology | Solar+Battery |
| Capacity | 51.3 MW |
| State | Arizona |
| County | Pinal |
| Point of interconnection | Abel 69 kV |
| Requested (queue) date | 2023-05-03 |
| Proposed in-service date | 2025-04-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Salt River Project |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata