AZ Queue Project SRP Q110 — Solar in Navajo, Arizona

AZ Queue Project SRP Q110 — Solar in Navajo, Arizona is a 300.0 MW solar interconnection project in Navajo, Arizona with a current status of withdrawn. It is proposed to connect at Silver King-Coronado 500 kV Line.

300.0 MWCapacity
WithdrawnStatus
AZMarket
SolarTechnology

Project facts

Canonical nameAZ Queue Project SRP Q110 — Solar in Navajo, Arizona
Queue IDSRP Q110
Statuswithdrawn
Source statusWithdrawn
MarketAZ
TechnologySolar
Capacity300.0 MW
StateArizona
CountyNavajo
Point of interconnectionSilver King-Coronado 500 kV Line
Requested (queue) date2023-09-08
Proposed in-service date2026-10-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSalt River Project

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata