AZ Queue Project SRP Q44 — Solar+Battery in Pinal, Arizona

AZ Queue Project SRP Q44 — Solar+Battery in Pinal, Arizona is a 100.0 MW solar+battery interconnection project in Pinal, Arizona with a current status of operational. It is proposed to connect at Vah-Ki 230 kV.

100.0 MWCapacity
OperationalStatus
AZMarket
Solar+BatteryTechnology

Project facts

Canonical nameAZ Queue Project SRP Q44 — Solar+Battery in Pinal, Arizona
Queue IDSRP Q44
Statusoperational
Source statusIn-Service
MarketAZ
TechnologySolar+Battery
Capacity100.0 MW
StateArizona
CountyPinal
Point of interconnectionVah-Ki 230 kV
Requested (queue) date2018-04-26
Proposed in-service date
Operational date2023-10-16
Withdrawn date
Developer
Utility / transmission ownerSalt River Project

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.