AZ Queue Project SRP Q84 — Battery in Maricopa, Arizona

AZ Queue Project SRP Q84 — Battery in Maricopa, Arizona is a 463.0 MW battery interconnection project in Maricopa, Arizona with a current status of withdrawn. It is proposed to connect at Orme 230 kV.

463.0 MWCapacity
WithdrawnStatus
AZMarket
BatteryTechnology

Project facts

Canonical nameAZ Queue Project SRP Q84 — Battery in Maricopa, Arizona
Queue IDSRP Q84
Statuswithdrawn
Source statusWithdrawn
MarketAZ
TechnologyBattery
Capacity463.0 MW
StateArizona
CountyMaricopa
Point of interconnectionOrme 230 kV
Requested (queue) date2021-10-01
Proposed in-service date2025-10-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSalt River Project

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.