AZ Queue Project SRP Q86 — Wind in Navajo, Arizona

AZ Queue Project SRP Q86 — Wind in Navajo, Arizona is a 407.0 MW wind interconnection project in Navajo, Arizona with a current status of withdrawn. It is proposed to connect at Coronado-Silver King 500 kV Line.

407.0 MWCapacity
WithdrawnStatus
AZMarket
WindTechnology

Project facts

Canonical nameAZ Queue Project SRP Q86 — Wind in Navajo, Arizona
Queue IDSRP Q86
Statuswithdrawn
Source statusWithdrawn
MarketAZ
TechnologyWind
Capacity407.0 MW
StateArizona
CountyNavajo
Point of interconnectionCoronado-Silver King 500 kV Line
Requested (queue) date2021-11-05
Proposed in-service date2024-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerSalt River Project

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata