Bad Creek is a 420.0 MW battery interconnection project in Oconee, South Carolina with a current status of operational.
420.0 MWCapacity
OperationalStatus
DUKMarket
BatteryTechnology
Project facts
| Canonical name | Bad Creek |
|---|---|
| Queue ID | 7125_2 |
| Status | operational |
| Source status | (OP) Operating |
| Market | DUK |
| Technology | Battery |
| Capacity | 420.0 MW |
| State | South Carolina |
| County | Oconee |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 1991-05-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Duke Energy Progress |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata