Badger Canyon-Reata is a 31.0 MW other interconnection project in Benton, Washington with a current status of active. It is proposed to connect at Benton PUD's Reata Substation.
31.0 MWCapacity
ActiveStatus
WAMarket
OtherTechnology
Project facts
| Canonical name | Badger Canyon-Reata |
|---|---|
| Queue ID | L0408 |
| Status | active |
| Source status | CONST AGRMT EXE |
| Market | WA |
| Technology | Other |
| Capacity | 31.0 MW |
| State | Washington |
| County | Benton |
| Point of interconnection | Benton PUD's Reata Substation |
| Requested (queue) date | 2017-01-20 |
| Proposed in-service date | 2017-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | City of Richland, Washington |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata