Barrett Ridge Energy - PARs (1013)

Barrett Ridge Energy - PARs is a 168.0 MW other interconnection project in Orange, New York with a current status of withdrawn. It is proposed to connect at Sugarloaf 138 kV.

168.0 MWCapacity
WithdrawnStatus
GMarket
OtherTechnology

Project facts

Canonical nameBarrett Ridge Energy - PARs
Queue ID1013
Statuswithdrawn
Source status0
MarketG
TechnologyOther
Capacity168.0 MW
StateNew York
CountyOrange
Point of interconnectionSugarloaf 138 kV
Requested (queue) date2020-05-05
Proposed in-service date2023-04-30
Operational date
Withdrawn date
DeveloperBarrett Ridge Energy, LLC
Utility / transmission ownerO&R

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.