Barry (3_A1CT2)

Barry is a 170.1 MW gas interconnection project in Mobile, Alabama with a current status of operational.

170.1 MWCapacity
OperationalStatus
SOCOMarket
GasTechnology

Project facts

Canonical nameBarry
Queue ID3_A1CT2
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologyGas
Capacity170.1 MW
StateAlabama
CountyMobile
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2000-05-01
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata