BASIN__-BE4 230 kV Substation (GEN-2024-141)

BASIN__-BE4 230 kV Substation is a 212.0 MW wind interconnection project in Mercer, North Dakota with a current status of operational. It is proposed to connect at BASIN__-BE4 230 kV Substation.

212.0 MWCapacity
OperationalStatus
NDMarket
WindTechnology

Project facts

Canonical nameBASIN__-BE4 230 kV Substation
Queue IDGEN-2024-141
Statusoperational
Source statusDISIS STAGE
MarketND
TechnologyWind
Capacity212.0 MW
StateNorth Dakota
CountyMercer
Point of interconnectionBASIN__-BE4 230 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date
Operational date2031-10-01
Withdrawn date
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata