Basin Electric 230 kV (GEN-2026-SR33)

Basin Electric 230 kV is a 202.0 MW battery interconnection project in Oliver County, North Dakota with a current status of active. It is proposed to connect at Basin Electric 230 kV.

202.0 MWCapacity
ActiveStatus
NDMarket
BatteryTechnology

Project facts

Canonical nameBasin Electric 230 kV
Queue IDGEN-2026-SR33
Statusactive
Source statusSPECIAL STUDY
MarketND
TechnologyBattery
Capacity202.0 MW
StateNorth Dakota
CountyOliver County
Point of interconnectionBasin Electric 230 kV
Requested (queue) date2026-07-23
Proposed in-service date2029-12-03
Operational date
Withdrawn date
Developer
Utility / transmission ownerBEPC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-15new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.