Basin Electric 230 kV (GEN-2026-SR33)
Basin Electric 230 kV is a 202.0 MW battery interconnection project in Oliver County, North Dakota with a current status of active. It is proposed to connect at Basin Electric 230 kV.
202.0 MWCapacity
ActiveStatus
NDMarket
BatteryTechnology
Project facts
| Canonical name | Basin Electric 230 kV |
|---|---|
| Queue ID | GEN-2026-SR33 |
| Status | active |
| Source status | SPECIAL STUDY |
| Market | ND |
| Technology | Battery |
| Capacity | 202.0 MW |
| State | North Dakota |
| County | Oliver County |
| Point of interconnection | Basin Electric 230 kV |
| Requested (queue) date | 2026-07-23 |
| Proposed in-service date | 2029-12-03 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | BEPC |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-15 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.