BASTROP (CAHOON) - STERLINGTON 115 SWYD 115.0kV (J2317)

BASTROP (CAHOON) - STERLINGTON 115 SWYD 115.0kV is a 225.0 MW solar interconnection project in Ouachita, Louisiana with a current status of operational. It is proposed to connect at BASTROP (CAHOON) - STERLINGTON 115 SWYD 115.0kV.

225.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameBASTROP (CAHOON) - STERLINGTON 115 SWYD 115.0kV
Queue IDJ2317
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity225.0 MW
StateLouisiana
CountyOuachita
Point of interconnectionBASTROP (CAHOON) - STERLINGTON 115 SWYD 115.0kV
Requested (queue) date2021-12-21
Proposed in-service date2024-10-31
Operational date2024-10-31
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata