BATAVIA - MORROW 138.0kV (J3908)

BATAVIA - MORROW 138.0kV is a 196.0 MW solar interconnection project in St. Joseph, Michigan with a current status of operational. It is proposed to connect at BATAVIA - MORROW 138.0kV.

196.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameBATAVIA - MORROW 138.0kV
Queue IDJ3908
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity196.0 MW
StateMichigan
CountySt. Joseph
Point of interconnectionBATAVIA - MORROW 138.0kV
Requested (queue) date2025-03-10
Proposed in-service date2025-04-30
Operational date2025-04-30
Withdrawn date
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata